Lewisham Gateway Cinema

Type

Fit out

Client

Balfour

Location

Lewisham

Value

1.4 million

Role

Principal contractor

Duration

19 weeks

Background

The Lewisham Gateway Cinema project involved the delivery of a 9-screen cinema shell, providing a high-quality structural and acoustic base ready for final fit-out. Delivered within a tight programme, the project required precise coordination, specialist construction methods, and robust acoustic performance.

Scope of works

  • Structural steel cinema stadia systems
  • Installation of acoustic isolators and specialist steel framing
  • Concrete plank and in-situ concrete flooring systems
  • High-performance structural solutions to meet cinema acoustic standards

Technical delivery

To meet the varying structural and acoustic requirements across the 9 screens, two construction methods were employed:

  • Precast Concrete Plank Stadia
    Acoustic steel frames were installed with precision, followed by precast concrete planks to form the main seating tiers, ensuring speed, accuracy, and acoustic performance.
  • In-Situ Concrete & Metal Decking Stadia
    For complex layouts, metal decking was fixed to the steel framework and concrete poured in-situ, delivering a seamless, durable floor finished to SR2 standard.

Challenges

The challenge was to carry out this work with the cinema and foyer still operational. Which included internal structural alterations to the foundations, and to the high-level steelwork, and the install of new structure to form the auditorium.

Solutions

Through detailed planning and a dedicated traffic management strategy, we implemented a controlled one-way system for deliveries, waste removal, and plant movements. Daily coordination meetings ensured seamless collaboration, maintaining safety and keeping the project on programme.

Results

The project was successfully delivered within the 19-week programme, providing a high-quality cinema shell that met all structural and acoustic requirements, ready for final fit-out.