Strip out and CAT A refurbishment
Norstar holdings
Mayfair, London
1.8 million
Principal contractor
17 weeks
Background
In this desirable setting in central London, we have refurbished the two upper commercial floors and the basement level into a modern, bike storage, shower and changing room. The works combine Cat A refurbishment with structural upgrades, including new plant installations, reglazing, and the formation of new WC cores and risers. Careful interventions within the basement space and terrace enhance both the performance and character of the building.
Solutions
The scheme provides renewed Cat A floors supported by new mechanical and electrical systems, upgraded glazing, and restored architectural details throughout. Structural works within the basement ventilation space introduce new primary plant, including AHUs, ensuring the building is prepared for long-term operational performance.
Results
Across the floors, new ceilings, lighting and services to create bright, contemporary offices designed for future occupants.
The result is a refined, modern workspace that retains the building’s character while offering high-quality accommodation in the heart of Mayfair.
![_St_brochure_270623[6]](https://maevecontractors.co.uk/wp-content/uploads/2026/01/St_brochure_2706236.jpg)
![Davies_St_brochure_270623[6]](https://maevecontractors.co.uk/wp-content/uploads/2026/01/Davies_St_brochure_2706236.jpg)
![15_Davies_St_brochure_270623[6]](https://maevecontractors.co.uk/wp-content/uploads/2026/01/15_Davies_St_brochure_2706236.jpg)